Start a conversation

Savings Details

This tab contains settings relating to how cost savings are calculated.


  • Savings Option
    • Determines how cost savings are calculated
    • Performance Bill Savings
      •  Savings = Weather Normalized Usage * Rate - Actual Cost
    • Normalized Rate Savings 
      • Savings = (Weather Normalized Usage - Actual Usage) *Rate
  • Blended Rate Option
    • Blended rates are used if not custom rates are set
    • Baseline Rate
      • Blended Rate of the baseline period
    • Performance Rate
      • Rate of the current performance month
    • Maximum Rate
      • Maximum of the two previous options
  • Blended Rate Range
    • Organization Baseline Last Bill
      • Use rate of last bill in the baseline period
    • Organization Baseline Range 
      • Average Rate over the baseline period
    • Regression Model Range
      • Average Rate over the dates used for the regression model for the particular building and utility type 
  • Projected Savings
    • Monthly Savings Estimates (or contract guarantees) to be used on the performance report
    • Will used the most recent savings value until a new one is entered
      • Example: If a rate is entered for year 1 and 4. Year 1,2, and 3 will use the year 1 rate then any years past 4 will use the year 4 rate
    • Year 0 savings can be entered for implementation period savings