This tab contains settings relating to how cost savings are calculated.
- Savings Option
- Determines how cost savings are calculated
- Performance Bill Savings
- Savings = Weather Normalized Usage * Rate - Actual Cost
- Normalized Rate Savings
- Savings = (Weather Normalized Usage - Actual Usage) *Rate
- Blended Rate Option
- Blended rates are used if not custom rates are set
- Baseline Rate
- Blended Rate of the baseline period
- Performance Rate
- Rate of the current performance month
- Maximum Rate
- Maximum of the two previous options
- Blended Rate Range
- Organization Baseline Last Bill
- Use rate of last bill in the baseline period
- Organization Baseline Range
- Average Rate over the baseline period
- Regression Model Range
- Average Rate over the dates used for the regression model for the particular building and utility type
- Organization Baseline Last Bill
- Projected Savings
- Monthly Savings Estimates (or contract guarantees) to be used on the performance report
- Will used the most recent savings value until a new one is entered
- Example: If a rate is entered for year 1 and 4. Year 1,2, and 3 will use the year 1 rate then any years past 4 will use the year 4 rate
- Year 0 savings can be entered for implementation period savings